{"id":33,"date":"2015-11-13T10:46:47","date_gmt":"2015-11-13T09:46:47","guid":{"rendered":"http:\/\/miontec-consulting.de\/cm\/?page_id=33"},"modified":"2016-01-03T17:17:46","modified_gmt":"2016-01-03T16:17:46","slug":"analyse-und-optimierung-ihrer-anlage","status":"publish","type":"page","link":"http:\/\/miontec-consulting.de\/en\/angebot\/analyse-und-optimierung-ihrer-anlage\/","title":{"rendered":"Analysis and optimization of your IEX-plant"},"content":{"rendered":"<p><\/p>\n<ul>\n<li>Assessment and analysis of your existing IEX-plant<\/li>\n<li>Verification calculations<\/li>\n<li>Measurements on-site, troubleshooting<\/li>\n<li>Recommendations for improvements and cost savings<\/li>\n<\/ul>\n<p>Unfortunately it happens occasionally: The DI system is limping. Then <em>much money is wasted<\/em> when often unnecessary double regenerations or regenerant amount elevations are applied.<\/p>\n<p>My <strong>objective<\/strong> is the <em> identification of the causes <\/em>for the minor performance as doubtless as possible and the demonstration of <em>ways to fix it<\/em>.<\/p>\n<p>My <strong>methods<\/strong> range from <em>measurements<\/em> at the current system, <em>recalculation<\/em> and comparison of currently achieved with as-new performance, basing on <em>resin examinations<\/em> up to <em>action to remedy<\/em> together with you or our related companies.<\/p>\n<p>Often the discussions also extend far beyond the actual IEX system into the <em>adjacent steps<\/em> and their optimization. Sometimes these are in fact the root causes for the poor performance of the IEX system.<\/p>","protected":false},"excerpt":{"rendered":"<p>Assessment and analysis of your existing IEX-plant Verification calculations Measurements on-site, troubleshooting Recommendations for improvements and cost savings Unfortunately it happens occasionally: The DI system is limping. Then much money is wasted when often unnecessary double regenerations or regenerant amount elevations are applied. My objective is the identification of the\u2026<\/p>\n<p> <a class=\"continue-reading-link\" href=\"http:\/\/miontec-consulting.de\/en\/angebot\/analyse-und-optimierung-ihrer-anlage\/\"><span>Continue reading<\/span><i class=\"crycon-right-dir\"><\/i><\/a> <\/p>\n","protected":false},"author":1,"featured_media":0,"parent":29,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"http:\/\/miontec-consulting.de\/en\/wp-json\/wp\/v2\/pages\/33"}],"collection":[{"href":"http:\/\/miontec-consulting.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/miontec-consulting.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/miontec-consulting.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/miontec-consulting.de\/en\/wp-json\/wp\/v2\/comments?post=33"}],"version-history":[{"count":19,"href":"http:\/\/miontec-consulting.de\/en\/wp-json\/wp\/v2\/pages\/33\/revisions"}],"predecessor-version":[{"id":202,"href":"http:\/\/miontec-consulting.de\/en\/wp-json\/wp\/v2\/pages\/33\/revisions\/202"}],"up":[{"embeddable":true,"href":"http:\/\/miontec-consulting.de\/en\/wp-json\/wp\/v2\/pages\/29"}],"wp:attachment":[{"href":"http:\/\/miontec-consulting.de\/en\/wp-json\/wp\/v2\/media?parent=33"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}